|
Bituminous
and Superpave Sampling Documentation for Construction Inspection has
never been easier!
Just
enter the date, the day's beginning lot, sublot, beginning tons (if
left over from previous day), Material, locations, load numbers and
tonnages, and PTM numbers 1 through 100. Bit sampler does the rest
and provides a cover sheet that replaces the normal material “buck
slip” and provides sublot buck slips for use when separating
tickets by sublot.
|